Programmatically update date changed on entities (OpenInsight Specific)
At 09 AUG 2000 11:40:10AM Jeff Hostetter wrote:
Is there a way for us to write a program to update the date that certain entities were changed so these entities will get included when we run the RDK for changes since a certain date?
Can we update the date progammatically without breaking any of the built in processes to update the dates?
At 09 AUG 2000 12:39PM [url=http://www.sprezzatura.com]The Sprezzatura Group[/url] wrote:
According to RDKREPVIEWEDIT, all the system does is look at the SYSREP_UPDATED$ field to determine if it should be in the list.
Changing this value should not cause a problem.
World leaders in all things RevSoft